This scheme involved the total refurbishment of a steel and concrete access bridge over the River Etherow.
Work included removal of large volumes of concrete encasing corroded steel beams, reinstatement using sprayed concrete techniques, together with blast cleaning and repainting of all the exposed steel upper works.